<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Cranes Archives - North America FarmQuip Magazine</title>
	<atom:link href="https://www.americafem.com/tag/cranes/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.americafem.com/tag/cranes/</link>
	<description>Equipment, Machines, attachments and implements for farming, agriculture and forestry in the United States and Canada</description>
	<lastBuildDate>Fri, 07 May 2021 14:06:26 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
	<item>
		<title>ECA Brings Greater Drilling Depths to U.S., Canada with BAUER MC 96/Berminghammer Lead Setup</title>
		<link>https://www.americafem.com/2021/05/11/eca-brings-greater-drilling-depths-to-u-s-canada-with-bauer-mc-96-berminghammer-lead-setup/</link>
					<comments>https://www.americafem.com/2021/05/11/eca-brings-greater-drilling-depths-to-u-s-canada-with-bauer-mc-96-berminghammer-lead-setup/#respond</comments>
		
		<dc:creator><![CDATA[Brian M. Fraley]]></dc:creator>
		<pubDate>Tue, 11 May 2021 16:00:49 +0000</pubDate>
				<category><![CDATA[Construction Equipment]]></category>
		<category><![CDATA[Drilling]]></category>
		<category><![CDATA[BAUER]]></category>
		<category><![CDATA[crane]]></category>
		<category><![CDATA[Cranes]]></category>
		<category><![CDATA[ECA]]></category>
		<category><![CDATA[ECA Canada]]></category>
		<category><![CDATA[setup]]></category>
		<guid isPermaLink="false">https://www.americafem.com/?p=245005</guid>

					<description><![CDATA[<p>Equipment Corporation of America is bringing the unique BAUER MC 96 Duty-Cycle Crane paired with hanging Berminghammer lead assembly to North America to allow its customers to achieve drilling depths of up to 150 feet (45 meters). Both ECA and ECA Canada will offer this rig to customers for sale or rental. &#8220;ECA is thrilled to [&#8230;]</p>
<p>The post <a href="https://www.americafem.com/2021/05/11/eca-brings-greater-drilling-depths-to-u-s-canada-with-bauer-mc-96-berminghammer-lead-setup/">ECA Brings Greater Drilling Depths to U.S., Canada with BAUER MC 96/Berminghammer Lead Setup</a> appeared first on <a href="https://www.americafem.com">North America FarmQuip Magazine</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="v1x_x_x_x_x_x_x_MsoNormal"><strong>Equipment Corporation of America</strong> is bringing the unique <strong>BAUER MC 96 Duty-Cycle Crane</strong> paired with hanging <strong>Berminghammer</strong> lead assembly to North America to allow its customers to achieve drilling depths of up to 150 feet (45 meters). <span style="background-color: #00ff00;">Both ECA and ECA Canada will offer this rig to customers for sale or rental</span>.</p>
<blockquote>
<p class="v1x_x_x_x_x_x_x_MsoNormal">&#8220;ECA is thrilled to add this BAUER MC 96 Duty-Cycle Crane equipped with a Berminghammer leader and a powerful BAUER KDK 280S Rotary Head to our fleet. This rig can drill up to 150 feet of single-pass piles (CFA or FDP) in various diameters, which is 25 feet more than our BG 45 in the high-end CFA setup,&#8221;</p>
</blockquote>
<p class="v1x_x_x_x_x_x_x_MsoNormal">says <strong>Director of BAUER Product Sales and Service Gordian Ulrich</strong>.</p>
<p class="v1x_x_x_x_x_x_x_MsoNormal">When equipped with the 138-foot-long (42-meter) Berminghammer lead, BAUER&#8217;s 130-ton duty-cycle crane can reach depths of up to 150 feet (45 meters). The specially adapted MC 96 mast geometry allows an operator to drill in single-pass mode using the complete mast length. This means that the 750-millimeter auger can achieve a depth of 115 feet (35 meters) in a completely continuous drilling process. It is also possible to attach a Kelly extension to drill down an additional 33 feet (10 meters).</p>
<figure id="attachment_245006" aria-describedby="caption-attachment-245006" style="width: 1112px" class="wp-caption aligncenter"><img fetchpriority="high" decoding="async" class="wp-image-245006 size-full" src="https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR.jpg" alt="" width="1112" height="1440" srcset="https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR.jpg 1112w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-232x300.jpg 232w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-791x1024.jpg 791w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-768x995.jpg 768w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-150x194.jpg 150w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-300x388.jpg 300w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-600x777.jpg 600w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-696x901.jpg 696w, https://www.americafem.com/wp-content/uploads/2021/05/1.-BAUER-Berminghammer-Lead-PR-1068x1383.jpg 1068w" sizes="(max-width: 1112px) 100vw, 1112px" /><figcaption id="caption-attachment-245006" class="wp-caption-text">Equipment Corporation of America (ECA) is bringing the unique BAUER MC 96 Duty-Cycle Crane paired with hanging Berminghammer lead assembly to North America to allow its customers to achieve drilling depths of up to 150 feet (45 meters).</figcaption></figure>
<p class="v1x_x_x_x_x_x_x_MsoNormal">This customized rig represents a partnership between two of the world&#8217;s leading manufacturers of foundation equipment. <span style="background-color: #00ff00;">Berminghammer and BAUER Maschinen collaborated to develop this special lead set up specifically for the MC 96 series of duty-cycle cranes in 2020</span>.</p>
<p class="v1x_x_x_x_x_x_x_MsoNormal">BAUER and Berminghammer also developed special joint kinematics to allow the lead itself to be rigged easily and quickly. No additional modifications are required to connect the Berminghammer lead to any MC duty-cycle crane.</p>
<p class="v1x_x_x_x_x_x_x_MsoNormal">In addition to the latest drilling features such as drill or pull assist, this MC 96 uses a standard BAUER KDK 280S Rotary Head, which is powered by the onboard Caterpillar C18 engine. This means that no additional power pack is required, which reduces noise levels and operating costs.</p>
<p><img decoding="async" class="size-full wp-image-245007 aligncenter" src="https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR.jpg" alt="" width="1440" height="1080" srcset="https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR.jpg 1440w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-300x225.jpg 300w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-1024x768.jpg 1024w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-768x576.jpg 768w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-150x113.jpg 150w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-600x450.jpg 600w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-696x522.jpg 696w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-1392x1044.jpg 1392w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-1068x801.jpg 1068w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-80x60.jpg 80w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-160x120.jpg 160w, https://www.americafem.com/wp-content/uploads/2021/05/2.-BAUER-Berminghammer-Lead-PR-265x198.jpg 265w" sizes="(max-width: 1440px) 100vw, 1440px" /></p>
<div class="td_block_wrap tdb_single_content tdi_72 td-pb-border-top td_block_template_14 td-post-content tagdiv-type" data-td-block-uid="tdi_72">
<div class="tdb-block-inner td-fix-index">
<p>The article was written by <strong>Brian M. Fraley </strong>of <a href="https://fraleyconstructionmarketing.com/">Fraley Construction Marketing</a></p>
</div>
</div>
<p>The post <a href="https://www.americafem.com/2021/05/11/eca-brings-greater-drilling-depths-to-u-s-canada-with-bauer-mc-96-berminghammer-lead-setup/">ECA Brings Greater Drilling Depths to U.S., Canada with BAUER MC 96/Berminghammer Lead Setup</a> appeared first on <a href="https://www.americafem.com">North America FarmQuip Magazine</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.americafem.com/2021/05/11/eca-brings-greater-drilling-depths-to-u-s-canada-with-bauer-mc-96-berminghammer-lead-setup/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Liebherr updates about its cranes and its projects</title>
		<link>https://www.americafem.com/2020/10/19/liebherr-updates-about-its-cranes-and-its-projects/</link>
					<comments>https://www.americafem.com/2020/10/19/liebherr-updates-about-its-cranes-and-its-projects/#respond</comments>
		
		<dc:creator><![CDATA[Michele Catinari]]></dc:creator>
		<pubDate>Mon, 19 Oct 2020 17:00:03 +0000</pubDate>
				<category><![CDATA[Construction Equipment]]></category>
		<category><![CDATA[Excavators]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[construction equipment]]></category>
		<category><![CDATA[crane]]></category>
		<category><![CDATA[Cranes]]></category>
		<category><![CDATA[Liebherr]]></category>
		<category><![CDATA[rotator]]></category>
		<category><![CDATA[tiltrotator]]></category>
		<guid isPermaLink="false">https://www.americafem.com/?p=200957</guid>

					<description><![CDATA[<p>The fourth generation of the owner&#8217;s family of crane and heavy haulage contractor Wiesbauer GmbH made their first trip to the Liebherr plant in Ehingen to take delivery of a crane. This traditional family-run company based in Bietigheim-Bissingen (Baden-Württemberg) has significantly upgraded its crane fleet. Not only did the Swabian company take delivery of another [&#8230;]</p>
<p>The post <a href="https://www.americafem.com/2020/10/19/liebherr-updates-about-its-cranes-and-its-projects/">Liebherr updates about its cranes and its projects</a> appeared first on <a href="https://www.americafem.com">North America FarmQuip Magazine</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="top_of_page">
<p class="bold"><span style="background-color: #008000;">The fourth generation of the owner&#8217;s family of crane and heavy haulage contractor <strong>Wiesbauer GmbH</strong> made their first trip to the Liebherr plant in Ehingen to take delivery of a crane</span>. This traditional family-run company based in Bietigheim-Bissingen (Baden-Württemberg) has significantly upgraded its crane fleet. Not only did the Swabian company take delivery of another <strong>LTM 1750-9.1 mobile crane</strong>, but an <strong>LTR 1220 telescopic crawler crane</strong> and a <strong>new 1000 tonne crawler</strong> crane were also added to its fleet. This LR 11000 celebrated a fantastic premiere in summer by hoisting a bridge to the north-east of Stuttgart.</p>
<p>When a major bridge construction project was started two years ago by Deutsche Bahn in southern Germany, Wiesbauer and its Liebherr LR 11000 crawler crane received the order to remove a 100-year-old iron railway bridge. After two years of operating with a temporary structure, the new bridge was finally installed at the site around 20 kilometers from Stuttgart at the beginning of September.</p>
<figure id="attachment_200958" aria-describedby="caption-attachment-200958" style="width: 710px" class="wp-caption aligncenter"><img decoding="async" class="wp-image-200958 size-full" src="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive01-96dpi.jpg" alt="" width="710" height="473" srcset="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive01-96dpi.jpg 710w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive01-96dpi-300x200.jpg 300w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive01-96dpi-696x464.jpg 696w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive01-96dpi-630x420.jpg 630w" sizes="(max-width: 710px) 100vw, 710px" /><figcaption id="caption-attachment-200958" class="wp-caption-text">two years after the first LR 11000 from Wiesbauer removed the 100 year old iron railway bridge, its successor installed the permanent replacement structure.</figcaption></figure>
<p>However, the large crane used for the initial work was no longer available to conclude the construction project. Like many other models of this crawler crane operated by European crane contractors, that LR 11000 is now in long term use for “Buckner Heavylift Cranes” at a major wind power project in the USA.</p>
<p>Wiesbauer, therefore, used a brand new 1,000-tonne crawler crane to remove the temporary bridge and install the final bridge structure and also for subsequent projects. <span style="background-color: #008000;">Although the LR 11000 had plenty of space for its crane operations two years previously to hoist the historic bridge, the conditions on-site this time were significantly more restricted</span> – there was very little space available for slewing operations, in particular, as a result of the assembly preparation areas for the new steel bridge and various prefabricated concrete components, containers and a great deal of other building material.</p>
<figure id="attachment_200960" aria-describedby="caption-attachment-200960" style="width: 710px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="wp-image-200960 size-full" src="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive04-96dpi.jpg" alt="" width="710" height="473" srcset="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive04-96dpi.jpg 710w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive04-96dpi-300x200.jpg 300w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive04-96dpi-696x464.jpg 696w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive04-96dpi-630x420.jpg 630w" sizes="auto, (max-width: 710px) 100vw, 710px" /><figcaption id="caption-attachment-200960" class="wp-caption-text">the V-frame in this case adjusts the 440 tonnes of suspended ballast to almost its maximum possible radius. Differences in the load cases can often be compensated easily using the infinitely adjustable folding frame.</figcaption></figure>
<p>However, using the adjustable V-frame, crane operator Thomas Kley was able to adapt to the lack of space and effortlessly retracted the ballast pallet suspended from the derrick boom to a radius of 15 meters. After traveling around 20 meters on its crawler carriers, when the load was subsequently positioned with a radius of 61 meters, a total of 440 tonnes of suspended ballast was extended to a radius of 28 meters, in other words almost the maximum radius, using the V-frame.</p>
<blockquote><p>“The V-frame with VarioTray, with its wide radius range from 13 to 30 meters, delivers massive benefits on sites like this, it saves time and also often dispenses with additional ballasting work during the job”,</p></blockquote>
<p>explained <strong>Marco Wilhelm</strong>, <strong>Authorised Signatory</strong>, and <strong>Project Manager</strong> at <strong>Wiesbauer</strong>.</p>
<blockquote><p>“The calculations and forecasts for the bridge weight changed constantly during this job. But this ballasting system enables us to react very flexibly when necessary. We had to do so several times on this site as a wide range of loads from ten to 185 tonnes had to be hoisted using a very wide range of radii over the six weeks that the job lasted. For example, due to a change in the design, the largest load that required hoisting was in fact a 185-tonne prefabricated concrete component.”</p></blockquote>
<p>For the jobs in the wind farm, which followed the bridgework, the crawler crane was once again operated exclusively with the V-frame and the VarioTray detachable ballast pallet.</p>
<blockquote><p>“We only need the full counterweight for erecting the crane. After that, we only use the undocked center section of the suspended ballast on the wind turbines.”</p></blockquote>
<p>But Marco Wilhelm does not believe that the new crawler crane flagship of the Wiesbauer fleet will be restricted to wind power sites, he also thinks that the crane will be very useful for jobs in industry and bridge construction as well as large infrastructure projects. With around 80 cranes and a workforce of 160, Wiesbauer GmbH &amp; Co.KG is a major provider of crane and heavy haulage logistics services based in southern Germany.</p>
<figure id="attachment_200959" aria-describedby="caption-attachment-200959" style="width: 710px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="wp-image-200959 size-full" src="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive02-96dpi.jpg" alt="" width="710" height="473" srcset="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive02-96dpi.jpg 710w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive02-96dpi-300x200.jpg 300w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive02-96dpi-696x464.jpg 696w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-lr11000-wiesbauer-affalterbach-motive02-96dpi-630x420.jpg 630w" sizes="auto, (max-width: 710px) 100vw, 710px" /><figcaption id="caption-attachment-200959" class="wp-caption-text">Problem-solver – the Liebherr crawler crane responded to the lack of space for slewing by using its adjustable V-frame. The suspended ballast is set to almost the minimum radius.</figcaption></figure>
<p>The integration of what is now the fourth generation of family members in the company provides consistency and continuity at Wiesbauer. The LTM 1750-9.1 mobile crane mentioned above was collected from Liebherr in Ehingen by the great-grandchildren of company founder Franz Wiesbauer.</p>
<p>This modern, power pack of a 9-axle crane is the third mobile crane of this type that Wiesbauer now has in its fleet.</p>
<blockquote><p>“One of the main reasons behind our purchase was the increase in crane performance delivered by the new 800 tonne kit for this crane”,</p></blockquote>
<p>explained the three young entrepreneurs. With a luffing jib and Y guying, the company now has a full set of equipment for the LTM 1750-9.1. The fact that it has the complete set makes this crane unique in Baden-Württemberg. In addition to the erection of tower segments at wind farm sites, the new crane will also be used for industrial installation work and jobs on the ”Filstal Bridge” project between Stuttgart and Ulm.</p>
<figure id="attachment_200961" aria-describedby="caption-attachment-200961" style="width: 710px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="wp-image-200961 size-full" src="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-ltm1750-9-1-wiesbauer-handover-96dpi.jpg" alt="" width="710" height="473" srcset="https://www.americafem.com/wp-content/uploads/2020/10/liebherr-ltm1750-9-1-wiesbauer-handover-96dpi.jpg 710w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-ltm1750-9-1-wiesbauer-handover-96dpi-300x200.jpg 300w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-ltm1750-9-1-wiesbauer-handover-96dpi-696x464.jpg 696w, https://www.americafem.com/wp-content/uploads/2020/10/liebherr-ltm1750-9-1-wiesbauer-handover-96dpi-630x420.jpg 630w" sizes="auto, (max-width: 710px) 100vw, 710px" /><figcaption id="caption-attachment-200961" class="wp-caption-text">the V-frame in this case adjusts the 440 tonnes of suspended ballast to almost its maximum possible radius. Differences in the load cases can often be compensated easily using the infinitely adjustable folding frame.</figcaption></figure>
<p>Source: <a href="https://www.liebherr.com/en/usa/latest-news/news-press-releases/detail/the-v-frame-makes-us-extremely-flexible.html">Liebherr</a></p>
</section>
<p>The post <a href="https://www.americafem.com/2020/10/19/liebherr-updates-about-its-cranes-and-its-projects/">Liebherr updates about its cranes and its projects</a> appeared first on <a href="https://www.americafem.com">North America FarmQuip Magazine</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.americafem.com/2020/10/19/liebherr-updates-about-its-cranes-and-its-projects/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
